An 8 bay complex made up of 2 frames, the frist frame is 4 bays with upper floor. On the ground floor the front of the building is made up entirely of full height glazing to allow plenty of natural light into the building while the left and rear are completely weatherboarded. The first floor has a full hip roof on the left and a barn hip roof on the right while at the front are two dormer windows each housing a 3 light window to allow the light into the upper floor of the building. The second frame is 4 bays in size again with full height glazing along the entire front wall as well as an internal aisle at the rear.
Specification Details for Complexes - WS01790 (Garages and Outbuildings)
Please note that these product properties are not a replacement for the manufacturer's literature and it is always recommended that English Heritage Buildings is consulted before specifying.
Registered Office: Third Floor, Sterling House, 20 Station Road, Gerrards Cross, Buckinghamshire, SL9 8EL
Registered No. 3921897
Previously SpecifiedBy
SpecifiedBy is now part of CausewayOne
We've updated our name and branding as the first step towards product data interoperability and the Golden Thread across the CausewayOne platform.
The features you rely on stay the same
For now, you can continue to use the www.specifiedby.com domain to access the same product data and search functionality.
Why the change?
CausewayOne is a construction operations platform used by 1,000's of contractors to design, win, manage and deliver projects.
CausewayOne Product Explorer will develop further to bring a central interoperable product data layer to all our contractor applications; by removing data siloes across parties & applications we can work towards a safer and more efficient industry.
Already a CausewayOne user?
You can use Single Sign-On (SSO) to access the functionality of Product Explorer inside the CausewayOne platform alongside your other Causeway applications.